Construction Review: Construction on Phase II of Camp Hall commerce park in Ridgeville
Frampton Construction Company is handling the construction on both phases of the Camp Hall commerce park project. According to the construction firm, the facility will be built using tilt-up concrete wall panels. Additionally, the development will also include the use of structural frame and thermoplastic polyolefin (TPO) roof materials. Tenants will have access to a cross-dock layout with a 40-foot clear height with 215 dock doors. On top of that, the facility provides four drive-in doors, along with 59 car spaces and 851 trailer spaces.
Frampton’s Senior Project Manager, Keith Horton described Camp Hall commerce park as an expertly planned, best-in-class industrial project. Therefore he said, his company was honored to be fully involved in the project’s development. Horton said they were pleased with the progress made so far on the first phase. As a result, their team would carry on with that same momentum throughout Phase II.
Link here to read more