We'd love to tell your story: 843-972-8072

Post and Courier: Frampton completes Curtiss-Wright manufacturing facility

Frampton Construction Company has completed a build-to-suit industrial manufacturing facility for Curtiss-Wright Corporation located within the Charleston Trade Center in Summerville.

The 144,000-square-foot building is home to Curtiss-Wright’s Steam and Air Solutions business unit and supports the design, manufacture, test, and shipment of U.S. Navy steam turbines and steam valves, nuclear steam turbines, aftermarket steam parts, upgrades, and overhauls. The facility was constructed of precast concrete panels and structural steel with complex heavy manufacturing equipment foundations and ceilings with a 40-foot clear height, tall enough to accommodate large overhead bridge cranes and other specialty equipment.

Link to the Post and Courier here to read the full article

Contact us

Recent News

When can we start to get your message out?

843-972-8072 / eboineau@eboineauandco.com

1632 Ware Bottom Lane
Mount Pleasant, S.C 29464

Never miss an update

Join our mailing list today!